EPC Projects

Completed Projects

UP-Gradation of Morshi-Chandurbazar-Achalpur Highway From 0+000 to 53+719 two lane Highaway Pkg.-4 Nagpur

Two Lane Highway Rajasthan Border – Fatehpur – Salasar Section of NH-65 (km. 000.000 to km. 154.000) in State of Rajasthan

Street Lighting work of Development of 6 Lane Urban Extension Road UER-2 NH-344M Pkg 1 in the state of Delhi on EPC mode

Street Lighting Work for Gurgaon – Sohana Project

Street Lighting on Highway, Bus Bays, Truck Lay Bay, Built Up Area and 6 Toll Plaza having 6 lanes Each RSHIP Package No

KCC DV PKG.-6 PROJECT

Integrated power dovelopment system TN-393 ALWAR

Highway Street Lighting Work for Washim-Panagare Project

Highway Street Lighting Work for Singhara-Binjhabhahal Project

Highway Street Lighting work for Rewari By pass Four Laning of NH-363 from Mancherial (Design KM 0.000 Existing Km 251.900) to REPALLEWADA

Highway Street Lighting Work for Kundal – Jhadol Project

Highway Street Lighting Work for Eight lane Carriageway starting at Rajasthan (Km 247+270 to Km 292+910) section

Highway Street Lighting work for Ch No. 17+695 to 33+000 Main Carriage way, Service Road & Junctions)

Highway Street Lighting with connection of on Grid Solar power solution for Narnaul-Ateli Mandi Project

Fixing Lighting Facility Along the Highway Stretch on Porbandar Jetpur Section Between Km 1+960 to Km 117+600 & Bamanbore-Garamore Section

ELECTRIFICATION OF SHILONG AIRPORT

ELECTRIFICATION OF PUMP HOUSE- BUDSU & KHARWALIYA- RAJASTHAN

Dv.08

Construction of 16 Nos. 33 KV RDSS Bays to be Installed at Various 132 KV & 220 KV GSS on Turnkey Basis (16 Nos. 33 KV RDSS)

765 400 KV GSS Civil work Sirohi for PGCIL

Let’s Power Your Next Infrastructure Project